Start and track production
Move planned work onto the floor and read where each order stands. The stored manufacturing order status is only open or done; the UI derives the production state from start, block, pick progress, batch progress, and output history.
-
Start the order. Open the Production menu and choose Work in progress. Ashicore stamps
startedAt, keeps the order open, and locks planning fields so execution history stays consistent.Planning is locked after start. Production, notes, output, and completion workflows remain available while the order is open. -
Block work that cannot proceed. Choose Blocked when an open order should stay in the queue but should not proceed. Blocking is separate from the stored status; unblocking returns the order to the derived state it otherwise has.
Not startedBlockedWork in progressDone -
Track readiness and progress. Use the list to compare rank, ingredients, production state, progress, sales order link, resource filter, and production deadline. The open tab is the queue; the done tab is closed production history.
Rank Order Product Ingredients Production Progress 1 MO-2052 Premium Potting Mix Done Work in progress 0 / 40 yd3 2 MO-2053 Raised-Bed Blend In Progress Not started 0 / 12 yd3
What’s Next
Section titled “What’s Next”- Ingredients & picking — how ingredient readiness and shortages are handled.
- Prioritize the queue — drag open orders into the right sequence.
- Complete & record output — produce finished lots and close work.