Resources
Resources are the labor, machine, overhead, or other cost centers that product operations can reference. Manufacturing orders snapshot operation cost context so historical orders keep their cost trail.
Manage Resources
Section titled “Manage Resources”Open Manufacturing > Resources to see the active resource list. The grid shows name, type, loaded rate per hour, and description. Use New Resource to add a cost center, or Edit on a row to update it.
| Name | Type | Loaded rate / hour | Description |
|---|---|---|---|
| Mixing line | Machine | $54.00 | 3-yard batch mixer |
| Blend labor | Labor | $38.00 | Operator time |
| Yard overhead | Overhead | $12.00 | Allocated facility cost |
The Resource Form
Section titled “The Resource Form”The dialog has four fields. Name and Loaded rate / hour are required. The loaded rate must be zero or positive.
Name*
Mixing line
Type
Machine
Loaded rate / hour*
$54.00
Description
3-yard batch mixer
Fields
Section titled “Fields”| Field | Type | Default | Description |
|---|---|---|---|
| Name | text | none | User-facing resource name. Required. |
| Type | enum | labor | labor, machine, overhead, or other. |
| Loaded rate / hour | money | none | Fully burdened hourly cost. Must be zero or positive. |
| Description | text | blank | Optional operating context. |
| Deleted at | timestamp | blank | Set when the resource is archived. |
Archiving
Section titled “Archiving”Deleting a resource archives it for future selection and detaches active BOM operation references. Manufacturing order snapshots keep their copied operation costs for history.