Create a purchase order
Build a draft order for the materials you buy from one supplier, set quantities in your purchase units, and order it so the material is expected from the supplier. This guide takes a standard order from an empty form to Ordered.
-
Start a new order. From Purchasing > Orders, choose New Purchase Order. Ashicore opens an unsaved card titled New purchase order. You can enter a purchase order number right away, or leave it blank so Ashicore assigns the next PO number on the first successful save. Once the draft first saves, Ashicore changes the URL to the saved order and keeps the order in Draft.
Order Supplier Status PO-1042 Cooperativa del Huila Received PO-1041 Yirgacheffe Coffee FCU Partially Received PO-1040 Crown Roasting Supply Ordered The purchase orders list. New orders open unsaved; after a valid autosave, you can leave and return to them at any time.
-
Choose a supplier. Pick who you’re buying from. The supplier is required before the first save; edits you make before choosing one stay on the unsaved card. The supplier’s name is copied onto the order when the order is saved. Later edits to the purchase order refresh that copied name from the current supplier record.
Supplier*Cooperativa del HuilaCH Cooperativa del Huila 9 itemsYC Yirgacheffe Coffee FCU 6 itemsCR Crown Roasting Supply 4 items -
Add material lines. Choose Add material for each item you’re ordering. Pick the item, enter Quantity in its UoM (for example, a 69 kg bag), and review Price per unit. The price prefills from the item’s default purchase price (and its default tax rate) and stays editable. Ashicore converts to stocking units and can show the resulting Landed cost — the stock-unit cost your inventory is valued at.
Item Quantity UoM Price per unit Total price Landed cost Huila Green RVS-GRN-HUILA 12 Bag ×69 kg $310.00 $3,720.00 $4.49 Yirgacheffe Green RVS-GRN-YIRG 8 Bag ×60 kg $372.00 $2,976.00 $6.20 Material subtotal $6,696.00 -
Add additional costs (optional). Choose Add cost to capture freight, customs, or other charges. In the Cost column, pick Shipping, Customs, or Other. For each row, choose how it’s distributed: By value spreads it across the lines and raises your landed inventory cost, while Not distributed raises the order total only and leaves inventory valuation untouched.
Cost Reference Distribution Amount Shipping Ocean freight — Bill #4471 By value $480.00 Other Pallet deposit Not distributed $60.00 Material subtotal$6,696.00Shipping (by value, landed)$480.00Other (not distributed)$60.00Order total$7,236.00 -
Set delivery details. Add the delivery address and an optional expected arrival date. There is no Save button: valid changes autosave. Until you choose a supplier, the draft remains unsaved; after the first save, it has a PO number and can be reopened. It stays editable and deletable until the first receipt.
Expected arrivalApr 18, 2026Delivery addressRiverside YardAddress line 12200 Riverside RdCityPaoniaRegionCOPostcode81428 -
Order it. The normal supplier-facing path is the header mail action: choose Send PO email, review Send documents for PO-1045, and send the email. If the order is still Draft, Ashicore first moves it to Ordered, stamps the ordered date, and registers expected supply. You can also order a saved draft without emailing by opening the status menu and choosing Ordered; selecting Ordered first saves pending valid changes, and drafts with no material lines are rejected.
Draft currentOrdered select →
What’s next
Section titled “What’s next”- Receive stock — turn ordered quantities into inventory.
- The purchase order lifecycle — what you can edit, receive, or delete at each status.
- Sync a supplier bill — create a payable bill before or after receipt.