Build a recipe
Recipes belong to products. Use the product card Recipe tab for components, alternates, and lot-age constraints; use the product card Production tab for operation costs.
-
Open the product’s Recipe tab. Create or open the product you make, then choose Recipe. Select whether the recipe basis is per unit or per batch, and confirm the output quantity or expected batch yield where the product supports batch production.
Recipe basisPer unitOutput quantity1 yd3 -
Add components. Add each material component and the quantity needed for the recipe basis. Components are stored on the current BOM revision and later copied to manufacturing order ingredients.
Component Quantity Unit Screened Compost 0.5 yd3 Coir Pith 0.3 yd3 -
Add alternates and constraints. Add approved alternate items where substitutions are allowed. Add a minimum lot-age rule when an ingredient must use lots old enough based on received date.
Type Value Effect Alternate Coconut Fiber Can be swapped before picking. Lot age 30 days Picking prefers eligible old-enough lots. -
Add operations and save. Move to the product Production tab to add operation cost rows. Choose the resource, crew size, planned minutes, and loaded rate. Saving creates a new current BOM revision; older revisions remain available for history.
Operation Resource Minutes Rate / hour Blend Mixing line 45 $160.00