Skip to content

Bills of materials

Bills of materials are managed from product cards, not from a separate Manufacturing BOM screen. Use the product Recipe tab for components, alternates, and lot-age constraints, and the Production tab for operation costs and resources.

product cardrevisionedsnapshotted by orders

PartPurpose
ComponentsRequired items and quantities per output.
AlternatesApproved substitutes with quantity factors.
ConstraintsLot strategy and minimum lot-age requirements.
Operation costsResources, crew, minutes, and rate inputs for cost rollup.